Built in a controlled environment with materials that are stored in that same environment so no part of your home is subjected to adverse weather: rain, snow or blistering sun prior to delivery to your property.

Walls & floors are built on perfectly level and square jigs assuring accuracy.

Continual oversight and inspections throughout the building process insures quality.

 

Typically built in two weeks! Production line efficiencies eliminate the necessary 'sequential' process of site building a home: excavation, foundation, floor joists, floor decking, wall framing etc. (weather conditions permitting). In the factory setting all components of your home are built at the same time, then assembled sequentially. While the home is being built in the factory, the NW Green land development staff completes the site preparation and foundation so your property is ready for the home delivery when it's completed at the factory.